Allwoth Harmony Entertainer

Allwoth Harmony Entertainer

Tuesday 18 March 2014

Feature Pillars

As you may know I have been thinking of putting stacked stone to the two front pillars of the house. This is what happens when I wait...... lol

 Since our bricks are quite dark, I think the white stacked stone will look awesome!
We were initially going to paint it.. but thought we would go something different. Plus I love the look. I guess... I have to research how much they cost.

Here are some examples below:





The white stacked stone example with slight shimmer.

Thursday 13 March 2014

It feels like centuries later.. still waiting.

A week has gone past since our last update. Allworth were sending plans through to Sydney Water for approval. And you know what? More waiting!



Thursday 6 March 2014

The taking so long side..

I dont know.. but Im kind of thinking the paperwork side for Allworth is bloody taking forever! We email our CSO and get a reply a week later, didnt even get a final tender yet so we can go to the bank to fix up the pre-approval. Their communication is definitely lacking. I'm actually quite annoyed about it. 

Sunday 2 March 2014

Thought I'd post our Colours and Upgrades.

Even though I have posted our colour schemes in my old blog, I thought id post it again to help other bloggers out there :)

Here are the colours we have chosen:

Bricks: PGH - Truffle

Roof: Monier Tiles - Barramundi (Horizon)
 
 
Gutters/Watertank/Downpipes: Woodland Grey
woodlandgrey
Fascia/Garage: Surfmist
surfmist
Front Door/Laundry Door/ Panel Garage Door Top: Dune
dune
We also had Snow Drop as our Eaves.
Windows were Pearl White.
Wall Colour selection: Kid Leather
Wall Colour for wet areas: Polar Bear
Below was our Kitchen/Bathroom/Laundry Selection.
 
 
 
Upgraded the Bricks, Carpet, Some mixer Taps, Front Door Lock and inside door handles, Chrome Square Drains, S/S Laundry sink just to name a few.
We also changed to glass splashback to kitchen changing our range hood to a concealed one.

More additional info with changes to the house:

* Extended the house out to the side 55cms. (media room, family room, kitchen/WIP slightly larger). Alfresco slightly larger also. Added concrete flooring as well.
* Caesar stone Bench tops to kitchen ( no waterfall on side)
* Ducted Air conditioning throughout.
* Extended ensuite vanity to meet each side of bathroom.
*Cavity sliding door to Bed 1 ensuite and WIR.
* Changed the windows on the side in the family room to be similar to Altona in Brooks Reach.
* Overhead cupboards to laundry.
* Made the garage a single panel door.
* Put an 870mm door to front.
* Tiles through hallway to Bed 2,3 & 4.
* Larger cupboard to Bed 3.
* Put overhead cupboard to fridge.